Construction waste is accepted as truck loads. Construction waste loads of household customers (passenger car or van, trailer) are accepted as miscellaneous waste.
Construction waste loads delivered by truck must be accompanied by a shipping document. Please note that sorting construction waste at source can reduce waste management costs. Read more about the types of waste accepted at sites.
Sorting
Construction waste is waste generated during the construction, demolition or renovation of buildings. Construction waste is classified into different categories according to how much of the load is directly recoverable waste and waste requiring further treatment:
Construction waste, category 1
The load is mainly (at least 90% of volume) waste to be recovered directly as material or energy.
Construction waste, category 2
The load includes clearly both waste to be recovered directly as material or energy and waste requiring further treatment.
Construction waste, category 3
The load is mainly (at least 90% of volume) waste requiring further treatment.
Construction waste, mainly wool
Construction waste loads containing mainly wool. Large quantities and regularly delivered wool loads must be agreed in advance by email: tyonjohto[at]kiertokapula.fi. Read more about acceptance of wool waste.